How Long Does It Take for Polyurethane to Dry?
Last Updated Apr 1, 2020 9:33:23 PM ET
Typically, a coat of polyurethane dries within 24 hours. For example, if polyurethane is applied to hard wood flooring, it is okay for a person to walk on the floor at the 24-hour mark.
Oftentimes, a professional places three coats of polyurethane on a hard wood floor. In such cases, 24 hours elapses from the application of one coat to the next. The floor is able to be walked upon at the expiration of 24 hours from the application of the final coat. Provided an appropriate drying period is allowed between coats of polyurethane, the final coat typically dries within a 24-hour time period.
More From Reference

10 Must-Watch TED Talks That Have the Power to Change Your Life

Strange Americana: Does Video Footage of Bigfoot Really Exist?

How the COVID-19 Pandemic Will Change In-Person Retail Shopping in Lasting Ways

Tips and Tricks for Making Driveway Snow Removal Easier

Here’s How Online Games Like Prodigy Are Revolutionizing Education

What Are the Steps of Presidential Impeachment?