Quick Answer

A concrete driveway takes 24 to 48 hours to dry. Walking on the driveway without damaging the concrete is possible after this time. Even though concrete is solid after two days, there are still time limits on what the driveway can handle.

Continue Reading
How long does it take for a concrete driveway to dry?
Credit: AFP AFP Getty Images

Full Answer

It is not advisable to use skateboards or bicycles on the driveway between day two and day seven. Concrete hardens enough to drive on after one week but only for normal-sized vehicles. For the first month after a concrete driveway is poured, it continues to harden. It typically reaches full driving capacity for any size vehicle after 30 days.

Learn more about Building Materials

Related Questions

  • Q:

    How do you clean antifreeze from a driveway?

    A:

    According to AcmeHowTo.com, antifreeze can be removed from a concrete driveway by covering the stain in water, sprinkling powdered laundry detergent on it, covering it in newspaper, wetting said newspaper and letting it all sit for at least three hours. After time is up, a wet nylon bristle brush can be used to scrub the area and ensure that it is completely clean.

    Full Answer >
    Filed Under:
  • Q:

    How do you install interior wall paneling?

    A:

    To install paneling, allow the paneling to acclimate to the home's climate for 24 to 48 hours, and install 1/2-inch furring strips cut that are 11 inches wide. Cut the panels 1/4 inch shorter than the existing wall, and cut holes in the panel for electrical outlets or other features. Secure the paneling to the wall using the nails or adhesive recommended by the paneling manufacturer.

    Full Answer >
    Filed Under:
  • Q:

    What are some DYI laminate flooring installation tips?

    A:

    Tips for installing laminate flooring include purchasing extra laminate to allow for cutting mistakes and having the unopened boxes of flooring acclimate to the room's temperature for 48 hours prior to installation. Another tip is to leave a one-fourth inch gap around the room's border to allow for floor expansion.

    Full Answer >
    Filed Under:
  • Q:

    How soon can you drive on new asphalt?

    A:

    It is best to wait at least 24 hours before driving on new asphalt to maintain its clean appearance. If the asphalt is driven on immediately, it causes scuff marks on the surface. If the new asphalt is on a road, it can be driven on immediately.

    Full Answer >
    Filed Under: