The Fuller Warren Bridge is a segmental bridge that carries I-95 across the St. Johns River in Jacksonville, Florida. The current bridge was completed in 2002, replacing the original bascule bridge span built on June 7, 1954. The current bridge was designed by HNTB Corporation in 1990. The entire bridge is over . long, with a main span of , and a vertical clearance of . The bridge now carries eight lanes across the span.
The original bascule bridge was tolled until 1988, when the city of Jacksonville abolished toll collections.