The Airborne Surveillance Platform (ASP) is an Indian defense project, initiated by the Defence Research and Development Organization, which aimed to produce an Airborne Early Warning System. Two prototypes were developed and flight tested for three years. The project was cancelled in 1999 after the prototype aircraft crashed, killing 8 scientists and aircrew. After four years of inactivity, the project was revived in 2004 with a new platform and radar.
The ASP programme, code-named "Airavat", is one of the key force multipliers in the modern war scenario. India's Defence Research and Development Organisation (DRDO) is developing an advanced surveillance platform based on an Hawker Siddeley HS 748 aircraft to detect targets at extended ranges with all round azimuth coverage. It is designed to handle 50 targets. It features a Hybrid navigation system, including both satellite and ground (beacon) based topography. The communication and data links are dual redundant secure systems.
The origin of the program possibly lies in the aftermath of the 1971 Indo-Pak war. As witnessed by the air-operation in the western front, timely information and coordination, namely vectoring and interception cannot be done effectively from the ground. In the late 1979, the DRDO formed a team to study the possibility of mounting an airborne radar on an existing aircraft.
The problem was not the availability of suitable aircraft but the fact that India did not process an effective airborne radar. An ad hoc team of specialists from LRDE began their work on developing an Airborne Radar, which in itself is a key "Enabling Technology" for the final product.
Studies and analysis began in July 1985 under project name 'Guardian', later (Possibly in 1987) renamed 'Airawat'. By the late 1980s an HS 748 had been modified with a 24 ft x 5 ft composite rotodome. The aircraft flew with a pylon (without the dome) in May 1989 and with the rotodome in November 1990. The Centre for Airborne Systems (CABS) was set up in February 1991, under Dr K. Ramchand to act as a system house and integration agency using all the expertise and infrastructure available in India. At the peak of its operations, some 300 Scientists and Engineers were employed/reported by/to CABS. The project received public recognition when the aircraft was flown during the flight demonstrations at the inauguration ceremony of the first Aero India show held in Bangalore in December 1996.
There were two testbeds employed in design program, with tail nos: H-2175 & H-2176; they were transferred from the IAF's western command.
A low side-lobe slotted wave guide planar array is designed to act as the Antenna. The antenna featured very low side lobe levels and a narrow beam width in azimuth. It handles high power (better than 3.3 KW average) and weighs just 160 kgs. For housing the primary and the secondary (IFF) antennas, an ellipsoidal structured (7.315 m x 1.524 m) rotodome was fabricated. It largely comprises composites (a real luxury to designers in that time) and aluminium alloy parts. The rotodome has since been successfully fabricated and flight tested on the ASP system. The rotodome is driven by a hydraulic servo system using aircraft.
The airborne radar data processor (ARDP), supporting TWS (track-while-scan), is required to form target tracks after receiving data from the various sensors of ASP, such as the primary radar (PR) and the secondary surveillance radar (SSR), which operate in TWS mode. The ARDP is required to correlate the target plots from scan to scan to maintain the target tracks. It also needs to perform the correlation of target information obtained from SSR and endorsement with the PR track information. In May 1997, all the requirements have been met and the system is delivered o CABS for integration.
The ASP is guided by a high accuracy navigation system, which consists of an inertial navigation system (INS) and a Doppler navigation system. The velocity drifts of INS are contained by Doppler velocities using a Kalman filter, resulting in good navigation accuracy required for long endurance missions of ASP. Presently, Work is in hand to integrate GPS/GLONASS receivers with INS to enhance performance, reliability and robustness.
The trials lasted for approximately 3 years when the ARDPs had to be replaced with newer variants and the trials were grounded for that time. In 1995 when the tests commenced again, most of what been expected of the platform had been realised. The radar and the antenna had been tweaked and hope was running high. However, at the same time the Air HQ staff re-affirmed their previous doubts about the specifications meeting the Air HQ requirements.
This led to controversy and the Defence Ministry had to step in to avert any further loss of face and, reportedly, the ministry affirmed to the Air HQ & Air Force that the ASP was not meant to meet the requirements of the forces, but rather to explore the possibilities of an airborne EW platform (with the only viable platform being the HS 748.)
Though observers point to these differences as the reasons contributing to the handing over of the ASP to the Indian Navy rather than the IAF, it should be observed that both the Indian Navy and Air Force did define the requirements.
After this clarification, the project progressed with renewed vigour, only to be set-back for a long time when, on 12 January 1999, the second prototype crashed (the first one being just a test-bed for the pylon studies). Everyone on board the aircraft died in the crash, a total of eight people (two crew, four scientists and two IAF engineers.)
However, by mid 2002 the project was "re-activated" , according to various news reports. As of March 2007, CABS was working on developing another indigenous airborne early warning (AEW) system. According to the Defence Minister, completion of development activities and commencement of user trials should occur in 2012. The platform selected this time is Brazilian Embraer with CABS AESA Radar.
The new system will be based on the Embraer EMB-145 aircraft and an active phased array radar. IAF and army propose to use this mini-AWACs systems as a compliment to the larger AWACS system being imported from Israel. The Union Cabinet has already given a green signal to the development of such an aircraft-based system.
Goals of the AEW & C Program: