The Northeast Blackout of 2003 was a massive widespread power outage that occurred throughout parts of the Northeastern and Midwestern United States, and Ontario, Canada on Thursday, August 14, 2003, at approximately 4:15 pm EDT (20:15 UTC), with virtually full restoration by the following day. At the time, it was the most widespread electrical blackout in history. The blackout affected an estimated 10 million people in the Canadian province of Ontario and 40 million people in eight U.S. states.
According to the New York Independent System Operator (or NYISO) – the ISO responsible for managing the New York state power grid – a massive power fluctuation affected the transmission grid at 4:10:39 p.m. EDT (20:10:39 UTC). From then through about 4:15 p.m. EDT (20:15 UTC), outages were reported in Cleveland, Akron, Toledo, New York City, Baltimore, Buffalo, Albany, Detroit, and parts of New Jersey. This was followed by other areas initially unaffected, including all of New York City, portions of southern New York state, New Jersey, Vermont, Connecticut, and most of Ontario, Canada. Eventually a large, somewhat triangular area bounded by Lansing, Michigan, Sault Ste. Marie, Ontario, the shore of James Bay, Ottawa, New York, and Toledo was left without power. According to the official analysis of the blackout prepared by the US and Canadian governments, more than 508 generating units at 265 power plants shut down during the outage. 22 of these were nuclear power plants. In the minutes before the event, the NYISO-managed power system was providing about 28,700 MW of load. At the height of the outage, the load had dropped to 5,716 MW, a loss of approximately 80%.
Within the large area affected, only a little over 200,000 people – in the Niagara Peninsula of Ontario, the easternmost corner of Ontario (centred on Cornwall), the portion of New York state including parts of Albany and north and west of Albany, a small pocket of mid-east Michigan, and the Upper Peninsula of Michigan – continued to have power, while the entire surrounding area dropped off the power grid. The unaffected area was protected by transmission circuit devices at the Sir Adam Beck Hydroelectric Power Stations in Niagara Falls, at a switching station of the hydroelectric power station in Cornwall, as well as central New York state. Philadelphia and the surrounding mid-Atlantic areas were also completely unaffected because PJM disconnected them from the grid.
Some essential services remained in operation in most of these areas, although backup generation systems in some cities were not up to the task. The phone systems remained operational in most areas; however, the increased demand by people phoning home left many circuits overloaded. Water systems in several cities lost pressure forcing boil-water advisories to be put into effect. Cell phones experienced significant service disruptions as cellular transmission towers were overloaded with the sudden increase in volume of calls. Major cellular providers continued to operate on standby generator power. Television and radio stations mostly remained on the air with the help of backup generators which remained online throughout the blackout. Some stations were knocked off the air for hours or during the entire blackout.
It was a seasonally hot day (over 31 °C or 88 °F) across much of the affected regions, and the heat played multiple minor roles in the initial events that triggered the wider regional power outage. The high ambient temperature increased energy demand as people across the region turned on fans and air conditioning. This caused the power lines to sag as higher currents heated the lines. When the outage knocked out air conditioning, buildings became hot, leading to dissatisfied residents. However, there was not the surge in crime that had been feared by many, including law enforcement agencies.
In areas where power remained off after nightfall, the Milky Way and orbiting artificial satellites became visible to the naked eye in metropolitan areas where they cannot ordinarily be seen due to the effects of particulate air pollution and light pollution.
Most of the interstate passenger rail transport North-East Corridor service was interrupted, as it uses electric locomotives; electrified commuter railways also shut down. VIA Rail in Canada was able to continue most of its service, and Amtrak and the commuter railways were able to introduce bare-bones diesel-powered services within 48 hours. The power outage's effects on international air transport and financial markets were widespread. The reliability and vulnerability of all electrical power grids was called into question.
Electrical power cannot easily be stored over extended periods of time, and is generally consumed less than a second after being produced. The demand load on any power grid must be matched by the supply to it and its ability to transmit that power. Any great overload of a power line, or underload/overload of a generator, can cause hard-to-repair and costly damage, so the power grid is disconnected if a serious imbalance is detected.
Power lines normally grow longer and sag between their towers when they get hotter as they carry more power, reaching a designed lowest height above the ground at a specified power level. To prevent the sagging lines from coming too close to trees and causing a short circuit (which can cause a forest fire), the trees are pruned, often on a five-year cycle. If the lines touch the trees, they are disconnected by systems which detect the sudden change in power flow from the short circuit.
These power changes from a line going out of service can sometimes cause cascading failures in the areas around them as other parts of the system see the fluctuations. These are normally controlled by delays built into the shutdown processes and by robust power networks with many alternative paths for power to take, which has the effect of reducing the size of the ripples. The borders of the blacked out areas on 14 August were where the blackout areas encountered systems with more spare capacity.
The operators of the power system control center are responsible for ensuring that they balance the supply of power, the loads (customers demanding that power), and the transmission line capacity, so that their system is in a state where no single fault can cause it to fail. After a failure affecting their system, operators are required within thirty minutes to obtain more power from generators or other regions or to shed load (meaning cut power to some areas), until they can be sure that the worst remaining possible failure anywhere in the system will not cause an unplanned system collapse. In an emergency they are expected immediately to shed load as required to bring the system into balance.
To assist the operators there are computer systems, with backups, which issue alarms when there are faults on the transmission or generation system. Power flow modeling tools let them analyze the current state of their network, predict whether any parts of it may be overloaded, and predict what the worst possible failure left is, so that they can change the distribution of generation or reconfigure the transmission system to prevent a failure should this situation occur. If the computer systems and their backups fail, the operators are required to monitor the grid manually, instead of relying on computer alerts. If they cannot interpret the current state of the power grid in such an event, they are to invoke a contingent operational pattern. If there is a failure, they are also required to notify adjacent areas which may be affected, so those can predict the possible effects on their own systems.
Backing up the local operators are regional coordinating centers which bring together information from adjacent areas and perform further checks on the system, looking for possible failures and alerting operators in different systems to them.
A joint federal task force was formed by the governments of Canada and the U.S. to oversee the investigation and report directly to Ottawa and Washington. The task force was led by then-Canadian Natural Resource Minister Herb Dhaliwal and U.S. Energy Secretary Spencer Abraham.
In addition to determining the initial cause of the cascading failure, the investigation of the incident also included an examination of the failure of safeguards designed to prevent a repetition of the Northeast Blackout of 1965. Issues of failure to maintain the electrical infrastructure, failure of upgrading to so-called "smart cables," failure of shunting and rerouting mechanisms, AC vs. DC intersystem ties, and substitution of electricity market forces for central planning were expected to arise. The North American Electric Reliability Corporation, a joint Canada-U.S. council, is responsible for dealing with these issues.
On November 19, 2003, Energy Secretary Spencer Abraham said his department would not seek to punish FirstEnergy Corp for its role in the blackout because current U.S. law does not require electric reliability standards. Abraham stated, "The absence of enforceable reliability standards creates a situation in which there are limits in terms of federal level punishment.
In February 2004, the U.S.-Canada Power System Outage Task Force released their final report, placing the main cause of the blackout on FirstEnergy Corporation's failure to trim trees in part of its Ohio service area. The report said that a generating plant in Eastlake, Ohio (a suburb of Cleveland) went offline amid high electrical demand, and that strained high-voltage power lines (located in a distant rural setting) later went out of service when they came in contact with "overgrown trees". The cascading effect that resulted ultimately forced the shutdown of more than 100 power plants.
The Task Force also found that FirstEnergy did not take remedial action or warn other control centers until it was too late, because of a computer software bug in General Electric Energy's Unix-based XA/21 energy management system that prevented alarms from showing on their control system. This alarm system stalled because of a race condition bug. After the alarm system failed silently without being noticed by the operators, unprocessed events (that had to be checked for an alarm) started to queue up and the primary server failed within 30 minutes. Then all applications (including the stalled alarm system) were automatically transferred to the backup server, which also failed due to the same reason as the primary one. After this time (14:54), all applications on these two servers stopped working. Another effect of the failing servers was that the screen refresh rate of the operators' computer consoles slowed down from 1-3 seconds to 59 seconds per screen.
| City | Number of people affected |
|---|---|
| New York City and Surrounding Areas | 21,100,000 |
| Greater Toronto Area (Golden Horseshoe) | 7,000,000 |
| Detroit and Surrounding Areas | 5,400,000 |
| Cleveland and Greater Cleveland | 2,900,000 |
| Ottawa | 780,000 of 1,120,000* |
| Buffalo and Surrounding Areas | 1,100,000 |
| Rochester | 1,050,000 |
| Baltimore and Surrounding Counties | 710,000 |
| Hamilton | 500,000 |
| London, ON and Surrounding Areas | 475,000 |
| Toledo | 310,000 |
| Windsor | 208,000 |
| Estimated Total | 50,000,000 |
| *Ottawa-Gatineau is a special case in that it is divided by a provincial boundary and the Ontario and Québec grids are not interconnected in any way. Gatineau had power. One may have seen the drastic cutoff of areas still having power when they were crossing the Portage Bridge between Gatineau and Ottawa - the cutoff was at the provincial line (street lights on the bridge were still lit on the Quebec side of the structure.) | |
Amtrak's Northeast Corridor railroad service was stopped north of Philadelphia, Pennsylvania, and all trains running into and out of New York City were shut down, initially including the Long Island Rail Road and the Metro-North Railroad; both were able to establish a bare-bones "all-diesel" service by the next morning. Canada's VIA Rail, which services Toronto and Montreal, suffered service delays, but most routes were still running, and normal service was resumed on most VIA routes by the next morning.
Passenger screenings at affected airports ceased. Regional airports were shut down for this reason. In New York, flights were cancelled even after power had been restored to the airports because of difficulties accessing "electronic-ticket" information. Air Canada flights remained grounded on the morning of August 15 due to reliable power not having been restored to its Mississauga, control center. It expected to resume operations by midday. This problem affected all Air Canada service and canceled the most heavily traveled flights to Halifax and Vancouver. At Chicago's Midway International Airport, Southwest Airlines employees spent 48 hours dealing with the disorder caused by the blackout's sudden incidence.
Many gas stations were unable to pump fuel due to lack of electricity. In North Bay, Ontario, for instance, a long line of transport trucks was held up, unable to go further west to Manitoba without refueling. In some cities, traffic problems were compounded by motorists who simply drove until their cars ran out of gas on the highway. Gas stations operating in pockets of Burlington, Ontario, that had power were reported to be charging prices up to 99.9 cents/litre ($3.776 per US gallon) when the going rate prior to the blackout was lower than 70 cents/litre. Customers still lined up for hours to pay prices most people considered unjustified by the blackout. Although part of the price hike was arguably due to price gouging, station operators could also claim that they had a limited supply of gasoline and did not know when their tanks would be refilled, prompting the drastic price increases.
Many oil refineries on the East Coast of the United States shut down as a result of the blackout, and were slow to resume gasoline production. As a result, gasoline prices were expected to rise approximately 10 cents/gallon (3 c/L) in the United States. In Canada, gasoline rationing was also considered by the authorities.
Cable television systems were disabled, and areas that had power restored (and had power to their television sets) could not receive information until power had also been restored to the cable provider. Those who relied on the Internet were similarly disconnected from their news source for the duration of the blackout, with the exception of dialup access from laptop computers, which was widely reported to work until the battery would run out of charge.
The blackout impacted communications well outside the immediate area of power outage. The New Jersey-based internet operations of Advance Publications were among those knocked out by the blackout. As a result, the internet editions of Advance newspapers as far removed from the blackout area as The Birmingham News, the New Orleans Times Picayune, and The Oregonian were offline for days.
Amateur radio operators passed emergency communications during the blackout.
Almost the entire state of New York lost power. Exceptions include Freeport and Rockville Centre on Long Island, which relied on localized power plants; the southernmost areas of the Southern Tier of Upstate New York, which relied on power from Pennsylvania; the city of Plattsburgh; Starrett City, Brooklyn, which has auxiliary power; most of the city of Buffalo; and pockets of Amherst in the Buffalo area, running off university power. There were also some small pockets of power in the suburbs of Rochester, as a few smaller power companies operating in those areas were able to keep running. Power was also available at the Kodak Park facility and its surrounding neighborhood in the city. Power was lost at the Oak Hill Country Club, in nearby Pittsford, New York, where the PGA Championship was being played, which caused minor interruptions to the tournament. Also, that evening's Major League Baseball game between the New York Mets and the San Francisco Giants at Shea Stadium was postponed. In New York, all prisons were blacked out and switched to generator power. The two Indian Point nuclear reactors on the Hudson River near Peekskill, the two reactors at Nine Mile Point nuclear plant, the single reactor at Ginna nuclear plant near Rochester and the FitzPatrick reactor near Oswego all shut down. With three other nuclear plants shutdown in Ohio, Michigan, and New Jersey, a total of nine reactors were affected. The governor of New York state, George Pataki, declared a state of emergency.
Manhattan, including Wall Street and the United Nations, was completely shut down, as were all area airports, and all New York area rail transportation including the subway, the PATH lines between Manhattan and New Jersey, Metro North Railroad and the Long Island Rail Road. Hundreds of people were trapped in elevators; by late evening the New York City Fire Department had reportedly confirmed that all stalled elevators in approximately 800 Manhattan high-rise office and apartment buildings had been cleared. More than 600 subway and commuter rail cars were trapped between stations; the NY State Metropolitan Transportation Authority and the Port Authority of New York and New Jersey—which operates the PATH lines—reported that all passengers were evacuated without serious injury. However, PATH was first to resume subway service on Sixth Avenue (albeit on 15-minute headways) by 6PM that evening.
Without traffic lights, gridlock was reported as persons in lower and midtown Manhattan fled their offices on foot; for hours into the evening the streets, highways, bridges and tunnels were jammed with traffic and pedestrians leaving Manhattan, though many civilians opted to help direct traffic. The bus journey from Manhattan to Washington which normally takes four hours took more than eight hours with reports that it took four hours just to get out of Manhattan. Mayor Michael Bloomberg advised residents to open their windows, drink plenty of liquids to avoid heat stroke in the heat, and not to forget their pets. Temperatures were 92 °F (33 °C) with high humidity, as New York had just experienced a record-breaking rain spell that had started at the end of July. With cell phone operation mostly stalled by circuit overloads, New Yorkers were lining up 10 deep or more at pay phones as ordinary telephone service remained largely unaffected.
While some commuters were able to find alternate sleeping arrangements, many were left stranded in New York and slept in parks and on the steps of public buildings. While practically all businesses and retail establishments closed down, many bars and pubs reported a brisk business as many New Yorkers took the opportunity to spend the evening "enjoying" the blackout. Since most perishable items were going to spoil anyway, many restaurants and citizens simply prepared what they could and served it to anyone who wanted it, leading to vast block parties in many New York neighborhoods. The Indigo Girls were scheduled to perform that evening at Central Park SummerStage, and the band took the stage as planned to play one of the only shows in the affected area, using generators that had been filled with fuel that morning. The venue also had bathrooms and vendors cooking food on propane grills.
40,000 police and the entire fire department were called in to maintain order. At least two fatalities were linked to the use of flames to provide light, and many nonfatal fires also resulted from the use of candles. The City's Office of Emergency Management activated the City's Emergency Operations Center, from which more than 70 agencies coordinated response efforts, which included delivery of portable light towers to unlit intersections, generators and diesel fuel to hospitals, and a portable steam generator necessary to power air conditioning units at the American Stock Exchange.
Verizon's emergency generators failed several times, leaving the emergency services number 9-1-1 out of service for several periods of about a quarter hour each. The City's 311 information hotline received over 175,000 calls from concerned residents during the weekend. Amateur radio operators attached to New York City ARES provided a backup communications link to emergency shelters and hospitals. Amateur radio repeaters were supplied with emergency power via generators and batteries and remained functional.
Many major U.S. networks (CBS, NBC, ABC, and FOX), and some cable TV Networks like HBO, MTV, and Nickelodeon were mostly unable to broadcast because of the lack of electricity in the New York area, however back-up stations in Houston, Texas, Dallas, Texas, and flagship transmitters there made it possible for prime-time television to be broadcast. (ABC chose instead to cover the news from Washington, D.C. during the blackout).
For delayed effects at Niagara Falls, see below under Ontario.
The day following the blackout, August 15, the New Jersey Turnpike stopped collecting tolls until 9:00 a.m.
A local controversy ensued in the days after the blackout, when the federal government ordered power companies to energize the HVDC Cross Sound Cable between New Haven and Long Island. This cable had been installed, but had not been activated due to environmental and fisheries concerns. The Attorney General of Connecticut, Richard Blumenthal, and the Governor of New York, George Pataki, traded insults over the cable. Connecticut politicians expressed their outrage that the cable was being turned on, since it did not help anyone in Connecticut, as the cable would transport power from Connecticut to Long Island.
Traffic lights, the subway and streetcars, the Toronto Stock Exchange, and CBC's Toronto studios were shut down in Toronto. The CBC switched to its backup studios in both Calgary and Vancouver for coverage, because newsgathering in Toronto was extremely difficult. The Toronto studios were only run by UPS systems. Many passengers had to be evacuated from subway trains by walking through the tunnels. Major Toronto hospitals reported that they had switched to generators and did not experience problems. The 9-1-1 system was operational. Highway 407, the world's first all-electronic toll highway, was gridlocked with passengers hoping to get a free ride. Parliament Hill was evacuated in Ottawa.
Toronto officials asked residents to curtail unnecessary use of water, as pumps were not working and there was only a 24-hour supply.
Traffic lights, which had no backup power, were all knocked out. All intersections were to be considered an all-way stop. Coupled with the beginning of the evening rush hour, this caused traffic problems. In many major and minor intersections in both large and small cities, such as Toronto and Burlington, ordinary citizens began directing traffic until police or others relieved them. Since there were not enough police officers to direct traffic at every intersection during the afternoon rush hour, passing police officers distributed fluorescent jackets to people who were directing traffic. Drivers and pedestrians generally followed the instructions from them even though they were not police officers.
Fierce disruptions of truck traffic in northeastern Ontario were reported due to the unavailability of fuel, including the backlog near North Bay. The tunnel and bridge between Windsor and Detroit were also closed, with the bridge's pillars illuminated by emergency floodlights, as to not pose a shipping and airplane hazard.
About 140 miners were marooned underground in the Falconbridge mine in Sudbury when the power went out. Mine officials said that they were safe and could be evacuated if necessary, but were not being evacuated due to the risks of doing so with no power. They were safely evacuated by the morning. In Sarnia, a refinery scrubber lost power and released above-normal levels of pollution; residents were asked to close their windows.
On the evening of August 14, Ontario premier Ernie Eves declared a state of emergency, advising nonessential personnel not to go to work on Friday, August 15. Residents were asked not to use televisions, washing machines, or air conditioners if possible, and warned that some restored power might go off again. Although the full state of emergency was lifted the next day (a Saturday), residents were warned that the normal amount of power would not be available for days, and were still asked to reduce power consumption. The roof of the Skydome in Toronto remained open in an effort to conserve power until August 21, when a thunderstorm struck.
The Toronto Transit Commission operated its streetcars on the Friday, but not on the weekend, and did not reactivate the subway and RT until Monday, August 18, after assurances were received that they would be exempted from any rotating blackouts that might be needed.
Major events such as concerts were canceled for several days, and the opening of the Canadian National Exhibition, scheduled for August 15, was postponed to Tuesday, August 19.
For two days of this recovery period, diversion of water from the Niagara River for hydroelectric generation was increased to the maximum level, normally used only at night and in winter in order to maintain the scenic appearance of Niagara Falls. The resultant drop in the river level below the falls meant that the Maid of the Mist tour boats could not dock safely, and their operation had to be suspended.
The Petro-Canada refinery in Oakville had to perform an emergency shutdown due to the lack of power. The plant's flare system produced large flames during the shutdown, leading to erroneous reports in the media that there had been a fire in the plant. The Petro Canada lubricants plant in Mississauga exploded a week later due to the increased demand.
The blackout contributed to at least eleven fatalities,
In the United States, the Bush administration has emphasized the need for changes to the U.S. national energy policy, Critical Infrastructure Protection, and Homeland Security. During the blackout, most systems that would detect unauthorized border crossings, port landings, or detect unauthorized access to many vulnerable sites, failed. There was considerable fear that future blackouts would be exploited for terrorism. In addition, the failure highlighted the ease with which the power grid could be taken down.
By evening of August 14, power had been restored to:
Con Edison retracted its claim that New York City would have power by 1 a.m. That night some areas of Manhattan regained power at approximately 5 a.m. (August 15), the New York City borough of Staten Island regained power around 3 a.m. on August 15, and Niagara Mohawk predicted that the Niagara Falls area would have to wait until 8 a.m.
By early evening of August 15, two New York airports and Cleveland airport were back in service.
Half of the affected part of Ontario had power by the morning of 15 August, though even in areas where it had come back online, some services were still disrupted or running at lower levels. The last areas to regain power were usually suffering from trouble at local electrical substations that was not directly related to the blackout itself.
By 16 August, power was fully restored in New York and Toronto. However, Toronto's subway and streetcars remained out of service until 18 August to prevent the possibility of equipment being stuck in awkward locations if the power was interrupted again. Power had been mostly restored in Ottawa, though authorities warned of possible additional disruptions and advised conservation as power continued to be restored to other areas. Ontarians were asked to reduce their electricity use by 50% until all generating stations could be brought back on line. Four remained out of service on the 19th. Illuminated billboards were largely dormant for the week following the blackout, and many stores had only a portion of their lights on. Those who did not engage in electricity conservation were treated with derision and scorn from fellow citizens. Among these were the news television stations that had many lights, TV screens, and sets fully working, the CTV Network to note.
Preparations against the possible disruptions threatened by the Year 2000 problem have been credited for the installation of new electrical equipment and systems which allowed for a relatively rapid restoration of power in some areas.
Mr. Hannity is taking calls from listeners in Manhattan. All the callers are describing the scene like it's Mardi Gras; people seem to be wildly enjoying this blackout. Hannity says everyone should buy bottled water and open their apartment windows. He congratulates the people of New York for remaining calm during this period of hardship, and he salutes them for not looting the stores and initiating a race riot. Christ. We have low standards in this country.