The South Devon Railway was built by Isambard Kingdom Brunel who proposed to move the trains by atmospheric power. Brunel and other engineers travelled to Dalkey in Ireland in 1843 to view such a system undergoing tests on the Dublin and Kingstown Railway. There, Brunel's engineer of locomotives for the GWR, Daniel Gooch, calculated that conventional locomotives could work the proposed line at lower cost, but Brunel's concerns about the heavy grades led him to try the system regardless. The South Devon Railway directors agreed on 28 August 1844 to Brunel's proposal to use atmospheric power on their line. Brunel estimated that by reducing the double track locomotive worked line to a single track atmospheric line a saving of £8,000 per year. Double track lines were favoured at that time even for lightly worked lines as this reduced the chances of a collision between trains, but the atmospheric system precludes the possibility of two trains travelling in opposite directions on the same section of track.
The pipes were ordered from George Hennet, an engineering contractor who worked on many of Brunel's lines. He established a factory at Bridgwater, Somerset, to make them.
The line opened with conventional steam locomotives to Teignmmouth on 30 May 1846 and was extended to Newton on 30 December 1846. The first piston carriage (which connected the train to the pipe) was delivered on 25 February 1847 and experimental running with atmospheric power started immediately. Public services were run to Teignmmouth from 13 September 1847 and extended to Newton from 10 January 1848. At this time some trains were still worked by locomotives, but from 23 February 1848 all scheduled trains were powered by the atmospheric system.
The leather valve along the top of the pipe tended to dry out and air could then leak in, but this was mitigated slightly by the passing trains spraying water on the leather. The harsh environment of the line, which runs adjacent to the sea for much of its length and is often soaked with salt spray, presented difficulties in maintaining the leather flaps provided to seal the vacuum pipes, which had to be kept supple by being greased with tallow; even so, air leaked in, destroying the vacuum.
Many trains arrived at Exeter from the Bristol and Exeter Railway very late. Because the South Devon line was only equipped with a telegraph that linked the stations, the engines had to start pumping for when the timetable said that the trains were due to enter their section and then keep pumping until the train eventually passed. This meant that the engines pumped for twice as long as was necessary and meant that much more coke was consumed than would have been the case if pumping had only been undertaken when the train was actually ready to be run. The engine houses were connected to the telegraph system on 2 August 1848 but a lack of trained staff meant that it was not fully used.
The railway company had set up a committee to investigate the efficiency of atmospheric working on 23 May 1848. In August Brunel gave a lengthy report on the system, and discussions with Joseph Samuda were held with a view to making repairs to the valve and guaranteeing its operation. On 29 August 1848 the directors, following Brunel's advice, recommended to the shareholders the suspension of atmospheric working. Atmospheric-powered service thus lasted less than a year, to 9 September 1848; the last engine pumping was at Exeter where an up goods train arrived in the early hours of 10 September. The engines and buildings were sold to other users, and most of the pipes were sold back to George Hennet for scrap. The atmospheric had cost the railway over £433,000 and about £81,000 was raised from the sales of redundant materials.
Despite the building of engine houses on towards Plymouth and on the Torquay branch the system never expanded beyond Newton. Similarly, the proposal to use the same system on Brunel's Cornwall Railway between Plymouth, Falmouth and Padstow was not pursued.
Three of the engine houses (Starcross, Torquay and Totnes) are still standing and the location of two others (Turf and Dawlish) are clearly visible. A section of the pipe, without the leather covers, is preserved at Didcot Railway Centre mounted on a short section of track which is inclined to show the gradient of the line from Newton to Dainton.
The buildings that housed the boilers and engines were built in a decorative Italianate style with square chimneys and spaced at around intervals. They were provided with engines from a variety of manufacturers including Boulton and Watt. The engine that pumped each section was the one towards which the train was travelling, for example a train leaving Exeter was powered by the Countess Wear engine creating a vacuum in the pipe in front of the train which was then propelled forward by the normal atmospheric pressure in the pipe behind the train's piston. Pumping started up to eight minutes before the scheduled departure of the train so as to build up a sufficient vacuum.
At stations a smaller pipe was laid alongside the track and a piston in this was connected to the train by a rope to start it moving. On arrival at the next station it was down to the driver to bring the train to a stand using its brakes. Engine houses were situated at every station except for Exeter St Thomas where the driver had to hold the train against the atmospheric pressure with the brakes.
The level portions used pipes but the steeper gradients west of Newton were to have used pipes. It is not clear how the change between the two pipe sizes would have been achieved unless the piston carriages were changed at Newton. It is also unclear how the level crossing at Turf was operated as the pipe projected some way above the rails.
Speeds of up to 70 mph (112 km/h) were achieved, but service speeds were usually around 40 mph (64 km/h). The timetable allowed 55 minutes for the journey, but records show that 36% of trains arrived more than five minutes early, some by more than ten minutes.
The square pond surrounded by trees on the river side of the line was the main water reservoir. Just to the south of this the foundations of some buildings can be seen. This was where the engine house itself was built, although some of the foundations are from later alterations. The building was demolished about 1860 and the stone used in a nearby farm.
The most familiar engine house, and the most intact one which actually saw service, is situated on the landward side of the line at the south end of Starcross railway station. The chimney was reduced in height for safety many years ago. For a while it had a new pitched roof, but this has since been removed.
After the engines ceased work, the boiler house was used by coal merchants until 1981. The engine area was used as a Wesleyan Church from 1867 to 1958, after which it was used as a youth club for a few years. The whole building was sold and reopened as a museum for the atmospheric railway in 1982. This has since closed and the building is now used by the local sailing club.
By the time the railway opened to Torquay the decision had already been made to abandon atmospheric working, so this engine house was never used. It was however completed and is the surviving example with the least number of exterior modifications. It is also the one least often seen. It is above the level of the railway where it runs in a cutting, on the right hand side of the line approaching from Newton Abbot railway station, about before reaching Torre railway station. It is easily viewed from a supermarket car park in Newton Road.
The engine house adjacent to Totnes railway station was never brought into use, but has been converted for use as a milk processing plant for Dairy Crest.