Tenom Pangi Dam is the
hydroelectric plant in
Tenom,
Sabah,
Malaysia. It is located 120 km south of
Kota Kinabalu on the Padas River. The project is a run-off river
hydroelectric power plant.
Power station
The power station is a
hydroelectric power station, using 3
turbines of 22 MW installed capacity totaling 66 MW. Continuous power output is 66 MW. Average annual energy output is 400 GWh. The station is operated by
Sabah Electricity.
Tenom Pangi Dam
Construction started 1978 and completed in 1984. The dam began operation on 1984. The plant suffered extensive
flood damage in 1988, where the trash rack and log boom were washed away and damaged the intake and gate machinery. It was refurbished in 2003.
Tenom Pangi Dam technical specifications
The permanent dam components are as follows:
Notable facts
- Tenom Pangi Dam is the only major hydroelectric dam in Sabah.