| Phase | Capacity (MW) | Type | number of turbines |
|---|---|---|---|
| Klondike I | 25 | ||
| Klondike II | 75 | GE Energy | 52 |
| Klondike III | 120 | GE Energy | 120 |
| 44 | Siemens | 101.2 | |
| 1 | Mitsubishi | 2.4 | |
| Klondike IIIa | 51 | GE Energy | 76.5 |
The Wind farm is currently the test site for several new turbines, notably the Mitsubishi 2.4 megawatt, 92-meter rotor wind turbine manufactured in Japan. During the construction of the last phase, an accident killed one worker and injured another.